
Tire marks, rust and faded color, handled together
Driveway Paver Sealing in Fort Myers, FL
Free driveway sealing estimate in Fort Myers, FL: call (239) 347-9749, reply within 1 business day.
- Brings out deeper paver color
- Fresh joint sand helps lock pavers in place
- Gives weeds less room to grow
- Makes the surface easier to keep clean
- Free estimate, no obligation
Request a Free Estimate
Free, no obligation.
How soon can a Fort Myers driveway be sealed?
A local contractor can seal your paver driveway in Fort Myers, FL, and a reply reaches you within 1 business day, usually much sooner. The estimate is free and nothing obliges you to accept it. To start, call (239) 347-9749.
The pull into the driveway each evening is the first look a home gets. Sealing aims to bring back an even color, keep the joints full and make oil drips and tire marks easier to clean. Mention the garage count and where the sprinklers land when you request a quote, and the quote can match the real job.

What do tires, sun and sprinklers do to a Fort Myers driveway?
A driveway takes a daily load that a patio never sees. Tires grind on the surface, oil drips from parked cars and the sun bakes the color. Fort Myers has an annual mean temperature near 75 degrees, and August averages about 83, per Wikipedia. A coat of sealer shields the color from that heat. To talk about your driveway, call (239) 347-9749.
Irrigation adds its own mark. IFAS Extension at the University of Florida says most Florida well water is high in iron and that it leaves orange streaks wherever it lands. A driveway edge beside a sprinkler head is the usual spot. If yours has streaks, point them out when you request a quote.
What does sealing do for a driveway that a wash alone does not?
A wash lifts dirt and growth. Sealer then adds a layer that a Fort Myers company says repels oil and tire marks and helps stop weeds in the joints. One Southwest Florida company adds that sealed pavers resist dirt and are easier to clean. To see what that means for your driveway, call (239) 347-9749.
Sealer does not fix a sunken paver or a drainage problem, so a driveway that dips by the garage needs a reset first. Ask whether resetting is in the price when you request a quote.
What is the driveway sealing process in Fort Myers?
The driveway sealing process is easier to judge when the steps are in front of you. One Fort Myers company lists inspecting, cleaning, treating growth, repairing, wet sanding the joints with fine silica sand and sealing. Another sets a 30 degree spray angle for washing, per Unilock, so the joint sand stays put. To go through the order for your driveway, call (239) 347-9749.
Inspect
The contractor checks for sunken pavers, oil stains, old sealer that has turned white and any weed growth along the joints.
Wash and treat
A rotating surface cleaner works across the field, and hot water machines are used by some Fort Myers companies. Oil and rust get their own treatment.
Fill the joints
Wet sanding sets fine silica sand. Colors listed by a Fort Myers company include tan, grey, black and pearl.
Coat and cure
A Fort Myers company applies three coats on driveways. Then comes the wait before tires roll on it.
How many coats and how long until the car goes back?
One Fort Myers company says driveways get three coats and patios two. A Southwest Florida company sprays several thin coats and not one thick one. Thin coats dry evenly, which means fewer shiny patches. To ask how many coats your quote includes, call (239) 347-9749.
For the wait, one local company says 24 hours before walking and 48 to 72 hours before parking, with full cure at about a week. Another lists 3 to 6 hours for feet and 48 hours for driving. Keep the second car at a neighbor's or on the street until the contractor gives you a date, and request a quote to book.
How does a driveway get ready before the sealer goes on?
Cleaning comes first, because sealer holds whatever it lands on. Unilock says to let pavers dry a few hours in warm sun, or about a day in cool shade, and to wait at least 24 hours after using a cleaner. A driveway beside a house wall with morning shade can lag behind the open stretch. For a drying plan, call (239) 347-9749.
Oil needs more than a wash. Unilock suggests soaking up a fresh spill with kitty litter or a paper towel before cleaning. Old spots left under a coat of sealer stay visible. Point out the oil stains when you request a quote.
What does driveway paver sealing cost in Fort Myers?
The published Fort Myers range is $1.50 to $3.25 per square foot with cleaning, joint sand and sealer. One company lists $1.50 to $3.00 for sealing and adds $3 to $5 per square foot for stripping old sealer first. No page lists a driveway only rate, so the table uses these published pieces. For a quote on your own driveway, request a quote.
A larger driveway usually costs less per square foot than a small patio, since the setup is spread over more pavers.
| Job | Size or basis | Price math |
|---|---|---|
| One car driveway | 400 sq ft | $600 to $1,300 at $1.50 to $3.25 |
| Two car driveway | 600 sq ft | $900 to $1,950 at $1.50 to $3.25 |
| Wide driveway with apron | 1,000 sq ft | $1,500 to $3,250 at $1.50 to $3.25 |
| Strip failed sealer first | 600 sq ft | $1,800 to $3,000 at $3 to $5, added to the sealing price |
Rates are the ones Fort Myers paver companies publish, not an offer. The final price comes from a contractor who has looked at your pavers.

How often should a Fort Myers driveway be resealed?
Driveways here usually need another coat every two to three years, as a Fort Myers company puts it. A covered patio can wait three to four years. Unilock gives three to five in general. Full sun and a daily commute push the date earlier. To have yours checked, call (239) 347-9749.
Check by pouring a little water on the surface. If it soaks in and darkens the paver instead of beading up, the coat is thinning. If it peels or looks white, it has failed. Then request a quote.
When is the right time of year for driveway sealing in Fort Myers?
A Southwest Florida company recommends October through April and warns that June through September storms make drying and curing difficult. Unilock wants 50 to 90 degrees, ideally 75. Wikipedia says October through May averages under 3.5 inches of rain a month in Fort Myers, which makes those months the dry stretch. To plan a date, call (239) 347-9749.
Dry months still bring thunder, so treat any date as a plan and not a promise. A good contractor tells you how the rain delay works before you request a quote.
Which Fort Myers areas can have a driveway sealed?
A local contractor serves Fort Myers and the places around it across three counties. Each page below has its own local facts. Does your street not appear above? A call to (239) 347-9749 will sort that out.
What do sealed driveways look like around Fort Myers?








Frequently asked driveway sealing questions in Fort Myers
How often should I seal pavers in Florida?
A Fort Myers company says driveways usually need a new coat every two to three years, and a covered patio can wait three to four. Unilock names three to five years as its general span. A driveway in full sun with daily car traffic belongs at the short end.
Does Fort Myers have hard water?
Most Florida well water is high in iron, according to the University of Florida's IFAS Extension, and iron in irrigation water leaves orange streaks on whatever it touches. If sprinklers reach your driveway you may see them along the edge. Rust is treated before sealing, because sealer would hold it in place.
How much does it cost to seal a 2,000 square foot paver driveway?
The published Fort Myers range of $1.50 to $3.25 per square foot works out to about $3,000 to $6,500 for 2,000 square feet, with cleaning, joint sand and sealer included. Old sealer, stains and natural stone can push a quote higher.
Does sealing a paver driveway keep weeds out of the joints?
A Fort Myers company says sealing helps stop weeds in the joints. The joints are refilled with polymeric or fine silica sand and set with water before the coat goes on, which gives the sealer a full joint to bond to.
How long before I can drive on a sealed paver driveway?
A Fort Myers company says to wait 24 hours before walking and 48 to 72 hours before parking on it. Another gives 3 to 6 hours for walking and 48 hours for driving. Full cure takes about a week, and the contractor should give you a date.
How many coats does a paver driveway get?
One Fort Myers company puts three coats on driveways and two on patios. Another applies two coats of topical sealer. A Southwest Florida company sprays several thin coats and not one heavy one.
Will sealer stop oil stains on my paver driveway?
It helps. A Fort Myers company says sealing repels oil and tire marks and helps stop weeds in the joints. Old stains still have to be treated before the coat goes on.
Can I seal my driveway pavers if the old sealer is peeling?
The old coat has to come off first. A Fort Myers company lists removing failed sealant as a recommended first step, and another prices stripping at $3 to $5 per square foot added to the sealing price.
What if it rains right after the driveway is sealed?
Unilock wants the pavers kept dry for up to 48 hours after sealing. Rain too soon can leave white marks or trap water under the coat. Ask how the contractor reschedules.
Want the driveway to look new again?
Call or send the short form. Fort Myers driveway requests are answered within 1 business day, usually much sooner than that.
Free, no obligation
